Sile Road Bridge Construction and Infrastructure Regulations

CLIENT PROJECT COST MANAGEMENT ISTANBUL METROPOLITAN MUNICIPALITY 17.205.858,07 £ CONSTRUCTION PERIOD 17 MONTH DETAILS


JOB DESCRIPTION

The scope of work Chile mah.kavşag Union of Road Intersection Between-Kemerdere düz.ilav Road Bridge Construction Construction and Regulation of curve. – WORK UNDER WAY TO ŞİLE 7.000 MT YOL İMALATI, TOTAL 1200 MT DERE ISLAHINDA 500 CSR STREAM IMPROVEMENT WITH PRECAST ELEMENTS, 2 ADET Kopru İMALATI, 300 LENGTH MT 700 MM DIAMETER WATER PRODUCTION, WASTEWATER AND STORM WATER CHANNELS, CONSTRUCTION OF STEEL CONSTRUCTION PEDESTRIAN CROSSING, AUTO WORKS OF RAILS, Various infrastructure, RETAINING STRUCTURES AND ELECTRICAL WORK DONE.