CLIENT MANAGEMENT
ANKARA BETON A.Ş.
PROJECT COST
316.920,00 £
CONSTRUCTION PERIOD
15 MONTH
JOB DESCRIPTION
The scope of work “Kayabaşı 2.Böl.348 Advertisement Kon. High School Sports Wed ilköğr.kreş. Infrastructure and Landscaping. Ins”
CLIENT MANAGEMENT
ANKARA BETON A.Ş.
PROJECT COST
316.920,00 £
CONSTRUCTION PERIOD
15 MONTH
The scope of work “Kayabaşı 2.Böl.348 Advertisement Kon. High School Sports Wed ilköğr.kreş. Infrastructure and Landscaping. Ins”
CLIENT PROJECT COST MANAGEMENT ISTANBUL METROPOLITAN MUNICIPALITY 17.205.858,07 £ CONSTRUCTION PERIOD 17 MONTH DETAILS
The scope of work Chile mah.kavşag Union of Road Intersection Between-Kemerdere düz.ilav Road Bridge Construction Construction and Regulation of curve. – WORK UNDER WAY TO ŞİLE 7.000 MT YOL İMALATI, TOTAL 1200 MT DERE ISLAHINDA 500 CSR STREAM IMPROVEMENT WITH PRECAST ELEMENTS, 2 ADET Kopru İMALATI, 300 LENGTH MT 700 MM DIAMETER WATER PRODUCTION, WASTEWATER AND STORM WATER CHANNELS, STEEL CONSTRUCTION PEDESTRIAN CROSSING ... Read more »
Drinking Water Hotline Network and Libya
CLIENT MANAGEMENT
THE MINISTRY OF HOUSING-SAFA DEVELOPMENT CORP.
PROJECT COST
21.591.326,27 £
CONSTRUCTION PERIOD
20 MONTH
The scope of work Of Drinking Water Network Zewar City And Lines Construction Work – ZEWAR CITY OF ALL WAS DRINKING WATER NETWORK. 40.000 PERSONALITY IS A CITY. DONE AT ALL HOUSE CONNECTIONS IN THE CITY CENTER.
INFRASTRUCTURE PLANNING
CLIENT MANAGEMENT
AFRICAN AFFAIRS OFFICE
CİHAZ Africa
PROJECT COST
16.904.795,00 £
CONSTRUCTION PERIOD
24 MONTH
The scope of work Abu Selim-El Hadba Settlements in the Region of El Hadra Regulation of Roads and Infrastructure – In the capital, Tripoli SELİM ABU ROAD IN DRINKING WATER PIPE REPLACEMENT OF REORGANIZATION AND WHERE TO CONNECT to the mains power supply
TERMINATION OF OLD NEW LINES SEWER SYSTEM OPENED PHONE CONNECTIONS TO MAINS, ELECTRIC CABLE LAYING WORKS DONE
YOUR ROADS ... Read more »
CLIENT MANAGEMENT
THE ISTANBUL METROPOLITAN MUNICIPALITY
PROJECT COST
9.486.529,02 £
CONSTRUCTION PERIOD
21 MONTH
İst. Apr. Yak. Across Highway, Railway and Main Arterial Roads.. Passing Sewerage and Other Infrastructure Facilities by Using Horizontal Drilling in Diameter Const..
CLIENT MANAGEMENT
ISKI GENERAL DIRECTORATE
PROJECT COST
2.470.141,94 £
CONSTRUCTION PERIOD
6 MONTH
The scope of work ASIA REGION VARIOUS DRINKING WATER NETWORK AND FLOOR SEPARATION CONSTRUCTION